1. Home
  2. Projekte
  3. Edyna S.r.l.
  4. Groundwater lowering for an excavation pit

Groundwater lowering for an excavation pit

year
2024
client
Edyna S.r.l.
location
Vandoies / Vintl

Groundwater was lowered for the underground construction volume during the excavation and construction phase using several drainage shafts arranged around the excavation pit.
Our office was responsible for geological construction management during the execution phase.

Edyna S.r.l.
Alpin Geologie: Groundwater lowering for an excavation pit
Alpin Geologie: Groundwater lowering for an excavation pit
Alpin Geologie: Groundwater lowering for an excavation pit
Alpin Geologie: Groundwater lowering for an excavation pit