Specialised studies, surveys, design and assistance to works for hydraulic regulation works to regularise the water from the railway platform in the trench and from the natural slope impluvium. Sub-surface drainage pipes, channels in cemented boulders of trapezoidal cross-section, crossing of the road with concrete piping, threshold in cemented cyclopean boulders for the introduction of drained water into the stream bed.
Hydraulic regulation of surface and underground water as part of the executive project "Interventions for the restoration of safety conditions of the railway line "Fortezza - San Candido" damaged by the landslide movement"
year
2024 - 2021
2024 - 2021
client
Quadrio Costruzioni S.p.A. / ANR Edilizia & Impianti S.r.l.
location
Valdaora / Olang
Valdaora / Olang










