Geological report, geotechnical report and seismic modelling report for the new construction of a farm building.
Trial pits were carried out to investigate the litho-stratigraphic, hydrogeological and geotechnical properties of the subsoil.
The stability of the excavation slopes was calculated and geological site management was provided during the excavation phase.
Construction of a farm building
year
2021
2021
location
Lana
Lana


