Emergency operation with creation of the geological inspection report.
Construction management for the emergency measures.
It was ordered to protect the existing spring box with a protective dam in the entrance area and by designing a damping layer on the ceiling of the spring box.
Construction management for the execution of the security structures at the spring box "Hochspeicher" Mittewald" - Flaggertal
year
2018
2018
client
Municipality of Fortezza / Franzensfeste
location
Fortezza / Franzensfeste
Fortezza / Franzensfeste