eological site management was provided during the excavation phase for the construction of a new factory site.
The groundwater lowering for the underground construction volume was carried out in the excavation and construction phase by several deep wells, which were arranged around the excavation pit.
A soil nailed wall was realized für supporting the excavation slope.
Due to the poor geotechnical subsoil conditions, a soil replacement was made.
The density of the subsoil was verified by plate loading tests before and after soil replacement.
Construction of a new factory site
year
2022
2022
client
Mein Beck G.m.b.H.
location
Nalles / Nals
Nalles / Nals