The groundwater lowering for the underground construction volume was carried out in the excavation and construction phase by several deep wells, which were arranged around the excavation pit.
Our office dimensioned and planned the system and submitted the request for water pumping and water return to the responsible authorities.
During the construction, geological site supervision was made.
Planning and site management of the groundwater lowering in construction
year
2020
2020
client
G. Pfitscher G.m.b.H.
location
Postal / Burgstall
Postal / Burgstall